The Malacky Secondary School had struggled with the heat in the school atrium for years. Tüchler's experience with blackout fabrics has helped a great deal: with SunSat 2016 and the TT2 track system, the atrium is now optimally shaded and the temperatures are easier to regulate.

 

 

Manufacture & Delivery & Assembly

192 meters of TT2 track with accessories delivered and mounted - everything as a pull-cord system. 400 m2 SunSat sewn and hung. Tensioned with almost Spannfix straps

 

 

 

 

SVK_Malacky_Kath Gym_Totale Schulatrium mit SunSat Verdunkelung_052015_80dpi_1000pix