Gorzów Wielkopolski Amphitheatre: chain hoist system and trussing
TÜCHLER hoisting technology also works outdoors without any problems, as can be seen at the Gorzow Amphitheatre, Poland
The challenges for people and technology are always a bit more difficult outdoors. That said, it is not really a problem for a CM LODESTAR chain hoist.
The challenge for the TÜCHLER engineering team here was creating the three slightly curved horizontal trussings so they matched the curved shape of the stage roof. A total of 19 D8+ chain hoists and 150 rm of trussing were installed. With an amazingly short installation time of just two working days, this project was realized to the complete satisfaction of our customer.
Development & Installation
- 19x LODESTAR D8+ chain hoists
- 1x control system
- 150 rm trussing system